Here are relevant reports on : construction-scheduling-software-market
-
Heavy Construction Equipment Market by Equipment Type (Excavator, Loader, Dozer, Dump Truck, Compactor, Crane), Propulsion, Power Output, Engine Capacity, Application, Electric Construction Equipment, Battery Chemistry, and Region - Global Forecast to 2033
The heavy construction equipment market is projected to grow from USD 160.11 billion in 2026 to USD 226.91 billion by 2033, with a CAGR of 5.1%. The Key Players Komatsu (Japan), Hitachi Construction Machinery (Japan), SANY Group (China), XCMG Group (China), Zoomlion (China), HD Hyundai Construction Equipment (South Korea), Kobelco Construction Machinery (Japan), and Liebherr Group (Germany).
- Published: June 2026
- Price: $ 4950
- TOC Available:
-
Europe IoT Market by Connectivity (Cellular, LP-WAN, Satellite), Software (IoT Platforms, Application Software, Analytics Software, Security & Safety Software), Focus Areas (Smart Manufacturing, Smart Retail, Smart Healthcare) - Forecast to 2030
The Europe IoT market is estimated to be valued at USD 118.18 billion in 2025 and is projected to reach USD 164.03 billion by 2030, registering a CAGR of 6.8% from 2025 to 2030. The report profiles key players, such as Microsoft (US), AWS (US), Cisco (US), Intel (US), Qualcomm (US), ABB (Switzerland), SAP (Germany), STMicroelectronics (Switzerland), NXP Semiconductors (Netherlands), TE Connectivity (Switzerland), Bosch (Germany), Software AG (Germany), Ericsson (Sweden), HQSoftware (Estonia), and emnify (Germany).
- Published: October 2026
- Price: $ 4950
- TOC Available:
-
Construction Industry Plasticizers Market by Type (Phthalates, Non-Phthalates), Construction Application (Flooring & Coverings, Pipes & Fittings, Wire & Cable, Roofing Membranes, Sealants & Adhesives), End Use (Residential, Commercial, Infrastructure), and Region - Global Forecast to 2030
The construction industry plasticizers market is projected to reach USD 5.43 billion by 2030 from USD 4.08 billion in 2025, at a CAGR of 5.90% during the forecast period. The Key Players BASF (Germany), Evonik Industries AG (Germany), Arkema (France), Eastman Chemical Company (US), and LG Chem (South Korea).
- Published: October 2026
- Price: $ 4950
- TOC Available:
-
Rainscreen Cladding Market by Material (Composite Materials, Metal, Fiber Cement, HPL), Construction (New Construction and Renovation), End-Use Sector (Non-residential and Residential), and Region - Global Forecast to 2024
The rainscreen cladding market is expected to grow USD 14.3 billion by 2024, at a CAGR of 7.1% during the forecasting period. Kingspan Insulation (UK), Sika (Switzerland), Rockwool International A/S (Denmark), Everest Industries Limited (Denmark), and Sotech Architectural Facade (UK) are key players operating in the rainscreen cladding market. Expansions, acquisitions, partnerships, and new product developments are some of the significant strategies adopted by these key players to enhance their position in the rainscreen cladding market.
- Published: November 2019
- Price: $ 4950
- TOC Available:
-
Software-Defined Data Center Market by Software-Defined Computing (Virtualization platforms, Hypervisors), Software-Defined Storage (Storage Management, HCI), Software-Defined Networking (Controllers, Infrastructure), Automation - Global Forecast to 2031
The software-defined data center market is expected to reach USD 265.80 billion by 2031, from USD 100.00 billion in 2026, with a CAGR of 21.6%. Key software-defined data center vendors include VMware (US), Microsoft (US), Cisco (US), HPE (US), IBM (US), Dell Technologies (US), Oracle (US), Nutanix (UK), Huawei (China), and Fujitsu (Japan).
- Published: March 2026
- Price: $ 4950
- TOC Available:
-
Construction Equipment Market by Machinery Type (Earthmoving equipment, Material Handling Equipment, Heavy Construction Vehicles), Propulsion Type (Diesel, CNG/LNG/RNG, Electric), Engine Capacity, End-Use Industry, & Region-Global Forecast To 2030
The global Construction equipment market size is expected to reach USD 286.51 billion in 2030 from USD 224.49 billion in 2025, at a CAGR of 5.0% from 2025 to 2030. The key players include Caterpillar (US), Liebherr AG (Germany), Terex Corporation (US), Volvo Group (Sweden), Komatsu (Japan), Hitachi Construction Machinery Co., Ltd. (Japan), SANY Heavy Industry Co., Ltd. (China), HD Hyundai (South Korea), XCMG Group (China), CNH Industrial N.V. (UK), and J C Bamford Excavators Ltd (UK) among others.
- Published: April 2025
- Price: $ 4950
- TOC Available:
-
Adhesives & Sealants Market by Adhesive Technology (Water-based, Solvent-based), Adhesive Application (Building & Construction, Paper & Packaging), Sealant Resin Type (Silicone, Acrylic), Sealant Application (Building & Construction, Consumer), and Region - Global Forecast to 2030
The adhesives & sealants market is expected to grow from USD 76.96 billion in 2025 to USD 91.23 billion by 2030, at a CAGR of 3.46% during the forecast period. Key players profiled in the report include Henkel AG & KGaA (Germany), H.B. Fuller Company (US), Sika AG (Switzerland), Arkema (Bostik) (France), 3M (US), Huntsman Corporation (US), Dow Inc (US), Wacker Chemie AG (Germany), RPM International, Inc. (US), Akzo Nobel N.V. (Netherlands), and PPG Industries, Inc. (US).
- Published: September 2025
- Price: $ 4950
- TOC Available:
-
Glass Insulation Market by Type (Insulating Glass Unit, Glass Wool, Cellular Glass), Application (Non-Residential Construction, Residential Construction, Industrial, HVAC), and Region - Global Forecast to 2021
The global glass insulation market was valued at USD 37.94 Billion in 2015 and is projected to reach USD 58.71 Billion by 2021, at a CAGR of 7.6% from 2016. This growth is mainly attributed to growth in the construction industry, rising demand for value-added glass products, increasing demand for green buildings, increasing cost of energy, and stringent government regulations.
- Published: September 2016
- Price: $ 4950
- TOC Available:
-
Elastomeric Membrane Market by Type (Sheet, Liquid Applied), Application (Roofs & Walls, Underground Construction, Wet Areas), End-use Industry (Non-residential, and Residential Construction), and Region - Global Forecast to 2022
The elastomeric membrane market was valued at USD 27.82 Billion in 2016 and is projected to reach USD 41.10 Billion by 2022, at a CAGR of 6.7% during the forecast period. The key players operating in the elastomeric membrane market are BASF, Sika, Carlisle Companies Inc., SOPREMA, Kemper System, Saint-Gobain, Firestone Building Products Company, Johns Manville, GCP Applied Technologies Inc., and Standard Industries Inc. These companies undertake dynamic business strategies that lead to propelling the growth of the elastomeric membrane market. However the market is restrained due to fluctuating raw material prices.
- Published: September 2017
- Price: $ 4950
- TOC Available:
-
Polished Concrete Market by Type (Densifier, Sealer & Crack Filler, Conditioner), Method (Dry, Wet), Construction Type (New Construction, Renovation), End-use Sector (Residential, Non-residential), and Region - Global Forecast to 2025
The polished concrete market is expected to grow from USD 2.2 billion in 2020 to USD 3.0 billion by 2025 at a compound annual growth rate (CAGR) of 5.6% during the forecast period.BASF SE (Germany), 3M Company (US), Sika AG (Switzerland), The Sherwin Williams Company (US), PPG Industries, Inc. (US), UltraTech Cement Limited (India), and Boral Limited (Australia)
- Published: February 2021
- Price: $ 4950
- TOC Available:
Records 41 to 50 of 50