Here are relevant reports on : data-center-construction-market
-
Data Center Onsite & Behind-the-Meter Power Market by Technology (Heavy-Duty Gas Turbines, Aeroderivative Turbines, Reciprocating Engines, Fuel Cells), Application, End User - Global Forecast to 2032
Data Center Onsite & Behind-the-Meter Power Market
- Published: October 2026
- Price: $ 4950
- TOC Available:
-
Asia Pacific Managed Services Market by Service Type (IT Infrastructure & Data Center Services, Network Services, Security Services, Communication & Collaboration Services, Mobility Services, and Information Services) – Forecast to 2030
The Asia Pacific managed services market is expected to grow to USD 137.38 billion by 2030, from USD 97.66 billion in 2025, at a CAGR of 7.1% during the forecast period. Key players in the Asia Pacific managed services market include IBM (US), Accenture (Ireland), Capgemini (France), DXC Technology (US), Atos (France), Tata Consultancy Services (India), HCL Technologies (India), Wipro (India), Fujitsu (Japan), and NTT Data (Japan).
- Published: September 2026
- Price: $ 4950
- TOC Available:
-
Floating Data Center Market Size, Share & Trends by Component, Deployment Type, Capacity, and End-User - Global Forecast to 2032
The global floating data center market size was valued at USD 450 Million in 2025 and is projected to reach USD 2,445 Million by 2032, expanding at a remarkable CAGR of 27.3% during the forecast period of 2026 to 2032. This exponential growth is predominantly driven by the escalating demand for highly sustainable data centers and the acute scarcity of prime real estate for hyperscale facilities in densely populated urban and coastal regions.
- Published: October 2026
- Price: $ 4950
- TOC Available:
-
Airflow Management Market by Offerings (Component (Blanking Panels, Grommets, Containment, and Air Filled Kits), and Services), Cooling System (Chilled Water, Direct Expansion), Data Center Type, Industry, and Geography - Global Forecast to 2035
The Airflow Management Market is gaining significant traction globally as data centers, commercial buildings, and industrial facilities increasingly prioritize energy efficiency, thermal optimization, and advanced environmental control systems. In 2025, the global Airflow Management Market size is estimated at approximately USD 7 billion, and it is projected to reach nearly USD 17 billion by 2035, growing at a CAGR of 9 %–11 % during the forecast period 2025–2035.
- Published: October 2026
- Price: $ 4950
- TOC Available:
-
Containerized Data Center Market by Container Types (20 ft 40 ft, customized), by Application (Greenfield, Brownfield, Upgrade and Consolidation), by Deployment size, by Vertical, and by Regions - Forecasts and Analysis (2014-2019)
In the present scenario, containerized data centers are experiencing significant adoption, and the market is experiencing escalating growth rate. This rate of adoption of containerized data centers is expected to grow at rapid pace in the future as well. Major players in the containerized data center market are HP, IBM, Dell, Huawei, Schneider, Emerson Network Power, Cisco and SGI.the global containerized data center market to grow from $2.27 billion in 2014 to $7.47 billion by 2019, at a Compound Annual Growth Rate (CAGR) of 26.9%. The table given below highlights the overall market size and Y-O-Y growth for the forecast period of 2014-2019.
- Published: September 2014
- Price: $ 4950
- TOC Available:
-
Data Center Energy Management Market Size, Share & Trends by DCIM Software, Power Distribution Units, UPS Systems, Energy Monitoring Sensors, Battery Energy Storage, and Cooling Optimization Software - Global Forecast to 2032
The global data center energy management market was valued at approximately USD 14.6 billion in 2025 and is projected to reach USD 30.1 billion by 2032, growing at a CAGR of 11.0% between 2026 and 2032. Growth is being driven by the collision of two forces reshaping digital infrastructure: explosive AI workload deployment, which is pushing rack densities and facility power draw to unprecedented levels, and mounting regulatory pressure on operators to prove energy efficiency and progress toward carbon-neutrality targets. The data center energy management market is no longer a back-office IT concern — it has become a boardroom priority as compute demand and power constraints collide.
- Published: October 2026
- Price: $ 4950
- TOC Available:
-
Saudi Arabia Managed Services Market by Service Type (IT Infrastructure & Data Center Services, Network Services, Security Services, Communication & Collaboration Services, Mobility Services, and Information Services) & Vertical - Forecast to 2030
The Saudi Arabia managed services market is projected to reach USD 7.83 billion by 2030, growing from USD 5.12 billion in 2025, at a CAGR of 8.2% during the forecast period. The key players include STC Solutions (Saudi Arabia), Mobily (Saudi Arabia), Zain KSA (Saudi Arabia), Elm Company (Saudi Arabia), Wipro (India), Tata Consultancy Services (India), Capgemini (France), IBM (US), and Atos (France).
- Published: September 2026
- Price: $ 4950
- TOC Available:
-
Hyper-Converged Infrastructure Market by Component (Hardware and Software), Application (ROBO, VDI, Data Center Consolidation, and Backup/Recovery/Disaster Recovery), End User, Organization Size, Enterprise, and Region - Global Forecast to 2025
The global Hyper-Converged Infrastructure (HCI) market size is expected to grow from USD 7.8 billion in 2020 to USD 27.1 billion by 2025, at a Compound Annual Growth Rate (CAGR) of 28.1% during the forecast period. Major vendors in the global HCImarketinclude Dell EMC (US), Nutanix (US), Cisco Systems (US), HPE (US), Huawei (China), NetApp (US), VMware (US), Pivot3 (US), Scale Computing (US), Startoscale(US), DataCore(US), Maxta (US), Microsoft(US), HiveIO(US), Supermicro(US), Hitachi Vantara(US), Diamanti(US), Lenovo(China), NEC Corporation (Japan), Riverbed Technology(US), IBM(US), Fujitsu (Japan), StarWind (US), Sangfor Technologies(China), and StorMagic (UK).
- Published: June 2020
- Price: $ 4950
- TOC Available:
-
Network Security Market By Solution (Firewall/Next Generation Firewall, Secure Web Gateways, Unified Threat Management, Network Detection & Response, Network Access Control), Network Environment (Branch, Campus, Data Center)- Global Forecast to 2030
The network security market is expected to grow from USD 84.50 billion in 2025 to USD 119.70 billion by 2030, at a compound annual growth rate (CAGR) of 7.2% during the forecast period. The Key Players Cisco (US), Palo Alto Networks (US), Fortinet (US), Check Point (US), Trend Micro (Japan), Verizon (US), IBM (US), Broadcom (US), Juniper Networks (US), Akamai (US), Netskope (US), Microsoft (US), CrowdStrike (US), Zscaler (US), Cloudflare (US), AWS (US), OpenText (Canada), Hillstone Networks (US), Barracuda Networks (US), Huawei (China), Trellix (US), SonicWall (US), Forcepoint (US), Sophos (UK), Ivanti (US), Extreme Networks (US), Zyxel Networks (Taiwan), Cato Networks (Israel), NordLayer (US), Versa Networks (US), WiJungle (India), Cynet (US), SECNAP Network Security (US), Nomios (Netherlands), easi (Belgium), GajShield (India), Stellar Cyber (US), NETSCOUT (US), and Fidelis Security (US) .
- Published: December 2025
- Price: $ 4950
- TOC Available:
-
India Data Center Market by Component (Electrical, Mechanical, Communication, Security), Model (Captive, Outsourced), Vertical (BFSI, Telecom and ITES, Defense), Trends, Vendor Ecosystem Analysis, and Porters Five Forces Analysis - Forecast to 2022
The India data center market size is projected to reach USD 1.5 billion by 2022 from USD 1.0 billion in 2018, at a Compound Annual Growth Rate (CAGR) of 11.4% during the forecast period. The market is driven by the deeper internet penetration, increase in digital data traffic, public cloud services, and higher expected growth for IoT. Fujitsu (Japan), Honeywell (US), NEC (Japan), Siemens (Germany), IBM (US), Johnson Controls (US), Hikvision (China), Dahua Technology (China), and Schneider Electric (France) are some of the key players in the India data center market providing physical infrastructure. Apart from these, there are many colocation services vendors in India, such as Netmagic, Ctrl S, ESDS, Prasa, and Sterling & Wilson.
- Published: April 2019
- Price: $ 4950
- TOC Available:
Records 31 to 40 of 50